P.V.RAMANAIAH
11-3-392/2/14/2,F.FLOOR,
SRINIVAS NAGAR COLONY,
PADMARAO NAGAR,
SECUNDERABAD – 500 006.
A.P. – INDIA.
Tel: +91-99494 58169 (R)
Mobile: +91-98661 88689
E-Mail: chamu_in@yahoo.com,
pvramanaiah69@gmail.com
Career
objective:
To pursue career with a progressive and dynamic organization providing
a mutually beneficial environment so that to make me efficient and
productive.
| Educational
Qualification |
: |
DIPLOMA IN CIVIL ENGINEERING
(Passed in 1990 with I class) |
| Computer
Proficiency |
: |
AutoCAD
Re 14, MS OFFICE & MS Project |
Experience:
I am having an experience of 17 Years in all types of civil construction
works viz., residential buildings, and industrial buildings/structures.
Nature
of duties well versed with: ( as Team leader )
-
Regular meetings with the client and client representatives to
discuss project progress, etc.
- Monitoring
and coordinating other professional consultants (Architecture,
Interior, electrical and Structural).
-
Undertake regular site inspections and chair meetings with contractor
to assess, programme and quality.
-
Issue minutes of meetings and progress reports to project team.
-
Manage assistant project management staff and supervise their
workload.
- Execution
of all construction activities of Building along with Finishing
Items, Preparation of Estimates, taking measurements, Contractor’s
bill certification and familiarity with external / internal plumbing
& sanitary systems, water supply & sewage treatment, Electrical
etc.
- Undertake
periodic valuations; assess contractor’s financial claims
and process payments to contractor through the client’s
organization.
- Undertake
snagging inspection on practical completion of the works and manage
process to rectify any defects.
- Inspect
the works undertaken for compliance with required quality and
good workmanship practice.
-
Inspect and assess/monitor health and safety on site.
- Managing
staff, financial reporting including annual/monthly budget and
expenditure plans.
- Preparing
work schedules, monitoring the progress, supervision of works.
Preparing daily/weekly progress reports.
- Professional
workload includes project managing various office fit outs and
refurbishment instructions.
- Taking
active part in complying with Quality (ISO 9001) & HSE (ISO
14001, OHSAS 18001) norms along with relevant documentation.
- Preparation
of SOQ & BOQ and site modification sketches.
Details
of experience:
| 1. |
|
Presently
working with M/s MAYTAS INFRA LTD., as Manager- Const. for it’s
Integrated town ship construction at Hyderabad. |
| 2. |
|
From
Feb.2005 to Oct.2005 worked with M/s DOUGLAS OHI LLC, OMAN (A
division of Interserve Group, UK.) as Senior Engineer for the
construction of 596MW & 33 MIGD Sohar Power and Desalination
Project at Sohar, Oman.
Main Contractor: M/s Doosan Heavy Industries & Const. Ltd.,
South Korea |
| 3. |
|
From
Jan.2002 to Jan. 2005, worked in Reliance Engineering Associates
Pvt. Ltd., (Reliance Group) as Sr. Construction Engineer for
its Infocomm project in A.P. (Through an out sourcing agency) |
| 4. |
|
From
Sept. 2000 to Dec. 2001, worked as Site-In-Charge in Jagajeevan
Constructions, Guntur for its residential complexes construction. |
| 5. |
|
Worked
as Site Engineer in MECON LIMITED from Aug.1998 to Aug. 2000
for the Construction of 2x25MW Captive power plant at HPCL,
Visakha Refinery and IOCL Pipeline terminal construction at
Vijayawada. |
| 6. |
|
Worked
as Junior Engineer in The Balaji Group, Chennai from July 1994
to May 1998 for the construction of Gayatri Sugar Complex Ltd.
at Nellore. |
| 7. |
|
Worked
as Site Engineer in MOHAN CONSTRUCTIONS, Hyderabad from April
1992 to May 1994 for New IG MINT site construction at Hyderabad. |
| 8. |
|
Worked
as Civil Supervisor in LCK CEMENTS Ltd., Macherla from April
1990 to April 1992 for construction of its expansion plant. |
Personal
Profile:
| NATIONALITY |
: |
INDIAN |
| DATE
OF BIRTH |
: |
14th
June 1969 |
| FATHER’S
NAME |
: |
P
NAGAIAH |
| PERMANENT
ADDRESS |
: |
1-34-239/1,
MARUTHI NAGAR,
GUJJANAGUNDLA,
GUNTUR – 522 006
A.P. – INDIA.
Tel: +91-99494 58169 (R)
Mobile: +91-98661 88689 |
| E-MAIL
ADDRESS |
: |
chamu_in@yahoo.com;
pvramanaiah69@gmail.com |
| LANGUAGES
KNOWN |
: |
TELUGU,
ENGLISH, HINDI |
| PASSPORT
NUMBER |
: |
E
8094392 (valid up to 22.03.2014) |
| MARITAL
STATUS |
: |
MARRIED |
| No.
OF CHILDREN |
: |
TWO |
| REFERENCE |
: |
1.
Mr. V.Koteswara Rao (Project Manager)
UV Consultants,
Hyderabad.
Mobile: +91-98857 53870 |
| |
|
2.
Mr. Aswath Narayana (Sr.Manager-Safety)
Maytas Infra Limited,
Hyderabad.
Mobile : +91-99493 50467 |
Click
here to email Mr. P. V. Ramanaiah
The
following CV of Mr. K. Nandan was posted on
October 19, 2004
K NANDAN
2A, SUDARSHAN FLATS
No. 6, DURAISAMPATH ROA
KUMARAN NAGAR
CHINMAYANAGAR STAGE II EXTN
CHENNAI 600 111
TEL. +91 94440 40929 /+91 44 30905575
E-mail: k.nandan@indiatimes.com
| 1.
|
TECHNICAL
QUALIFICATION |
| |
Diploma
in Civil Engineering – 1975 |
| |
|
| 2. |
KEY
EXPERIENCE |
| |
Construction
management of large integrated industrial projects. |
| |
Construction management of Mega Thermal Power Plants
– Combined cycle, multi fuel power plants. |
| |
Construction
management of state-of-the art infrastructure projects
and modern townships. |
| |
|
| 3.
|
KEY
QUALIFICATION |
| |
Knowledge
in turnkey execution of multi disciplinary projects
|
| |
Project
planning, resource planning, preparation of project
monitoring manuals, bar charts, pert charts and progress
reports. |
| |
Detailed
specification, BOQ, tendering, negotiation, bid evaluation,
contract documentation, site supervision, contract administration
and procurement services for bought out items. |
| |
Cash
flow forecast, materials forecast, field accounting
and certification for payment and material reconciliation. |
| |
Clearances
from statutory authorities. |
| |
|
| 4. |
CAREER
PROFILE |
| |
|
| ORGANISATION |
POSITION
HELD |
DURATION |
| Mahindra
Acres Consulting Engineers Ltd., Chennai (Joint Venture
company of M/s. Mahindra & Mahindra Ltd and M/s. Acres
International, Canada) |
General
Manager |
April
1999 to till date |
| Delta
Mechcons (India) Ltd., Mumbai |
Asst.
General Manager |
July
1995 to Mar. 1999 |
| S.K.B.Builders
& Fabricator, New Delhi |
Project
Manager |
March
1993 to Jun. 1995 |
| Khalsa
Brothers, Durgapur |
Construction
Manager |
Sept.
1992 to March 1993 |
| Alok
Builders, Jagdishpur |
Project
Manager |
Dec.
1986 to Aug 1992 |
| FCC
Projects Pvt. Ltd., Kanpur (UP) |
Resident
Engineer |
May
1981 to Nov. 1986 |
| Beejay
Associates (C) Pvt. Ltd., Pune |
Site
Engineer |
May
1978 to May 1981 |
| Tulsi
Ram Aggrawal, Ghoradongri, Dist.Betul |
Junior
Engineer |
Aug.1975
to May 1978 |
| 5. |
PROFESSIONAL
EXPERIENCE |
|
|
| |
Jan.
2003 - Till Date |
|
Present
Assignment: |
| |
|
|
As
“GENERAL MANAGER” for TIRUPUR WATER SUPPLY
& SEWERAGE PROJECT, for M/s New Tirupur Area Development
Corporation Ltd., (NTADCL) in the capacity of CONSORTIUM
REPRESENTATIVE CO- ORDINATOR for the team comprising of
M/s Gesco Corporation Ltd., MUMBAI, M/s United Utilities
Inc, UK, M/s Wilbur Smith Associates, USA, involved in
Interface Engineering & Management, Project co-ordination,
Project Monitoring & other related functions. Responsible
for close interaction with foreign consultants & contractors,
like WILBURSMITH ASSOCIATES, USA;UNITED UTILITIES Inc,
UK & GKW, GERMANY & GESCO CORPORATION LTD, LARSEN
& TOUBRO LTD, HINDUSTAN CONSTRUCTION CO. LTD.&
owner NTADCL. |
| |
Apr.1999
- Jan 2003 |
|
As
“PROJECT MANAGER” with M/s MAHINDRA ACRES
CONSULTING ENGINEERS LTD., for MAHINDRA INDUSTRIAL PARK,
CHENNAI, wherein master planning was of M/s JTCI, Singapore,
presently known as ASCENDAS. |
| |
Nov.
1997 - Mar. 1999 |
|
As
“Asst. General Manager (Civil)” with M/s Delta
Mechcons (India) Ltd. Mumbai for construction of Sub-station
& PIB Buildings at RPL, Jamnagar. |
| |
Mar.
1997 - Nov. 1997 |
|
As
“Asst. General Manager (Civil)” with M/s Delta
Mechcons (India) Ltd. Mumbai for construction of 160 MW
Combined Cycle Power Project of M/s Sumitomo Corporation,
Japan for their Client M/s Andhra Pradesh Gas Power Corporation
Ltd. at Vijjeswaram (A. P.) |
| |
July
1995 - Feb. 1997 |
|
As
“Project Manager” with M/s Delta Mechcons
(India) Ltd., Mumbai for Construction of Civil & Structural
work at 9 x 33 MW combined Cycle Project at Assam Gas
Based Power Project, Kathalguri, Assam. |
| |
Mar.
1993 - Jun. 1995 |
|
As
“Project Manager” with M/s S. K. B. Builders
& Fabricator. M-71 Greater Kailash-II New Delhi at
Lucknow & Sampla dist. Rohtak & Indian Oil Corporation
Ltd. Panipat Refinery Project. Village Baholi, Panipat. |
| |
Sep.
1992 - Mar. 1993 |
|
As
“Construction Manager” with M/s Khalsa Brothers
Durgapur at U.P Petrochemicals PATA Dist. Etawah (U.P)
at Area Grading Roads Drains & Culverts Phase - IIB
and Canal Diversion Project. |
| |
Dec.
1987 - Aug. 1992 |
|
As
“Project Manager” with M/s Alok Builders,Jagdishpur,
a
Contractor to M/s Larson & Turbro Limited, New Delhi.
M/s N. S. Guzder & Co. Ltd. Mumbai and M/s Indo -
Gulf Fertilisers & Chemical Corporation Ltd., Jagdishpur.
|
| |
May
1981 - Nov. 1986 |
|
As
“Resident Engineer” at Hindustan Aeronautics
Ltd. Korwa Division, Indo Gulf Fertiliser & Chemical,
Jagdishpur Dist. Sultanpur (UP) for SNAM PROGETTI Spa
Milano, Italy, Tanda Thermal Power Project, Tanda Dist.
Faizabad (UP) Samrat Bicycles, Gauriganj Dist. Sultanpur
(UP) & Parichha Thermal Power Project Parichha, Dist,
Jhansi (UP) With M/s FCC (projects) Pvt. Ltd. Kanpur (UP). |
| |
May
1978 - May 1981 |
|
As
“Site Engineer” at Ordinance Factory, Itarsi
with M/s Beejay Associates (C) Pvt. Ltd., Pune for M/s
Joseph Messigner & Co. Gmbh, West Germany. |
| |
Aug.
1975 - May 1978 |
|
As“Junior
Engineer” at Satpura Thermal Power Project, Sarani,
Distt. Betul (M.P) with M/s Tulsi Ram Aggarwal, Ghoradongri |
| |
|
|
|
| 6. |
MAJOR
ASSIGNMENT PROFILE |
|
|
| |
|
| |
Large
integrated industrial township – Mahindra City Near
Chennai |
| |
The
project involves establishment of state-of-the-art technology
Industrial Township of international standards targeted
for MNC’s encompassing 1440 acres. The nature of
work involves site grading, roads, drainages, water supply
& sewerage, telecommunication, electrical distribution,
water treatment and storage plant, sewage treatment plant
etc. |
| |
|
| |
Township
for Satpura Thermal Power Project - Sarni Dist. Betul
(M.P.) |
| |
The
scope involved laying of approximately 25 Kms. of roads
including necessary drains and culverts. |
| |
|
| |
Ordinance
Factory - Itarsi (M.P.) |
| |
The
scope involved complete road works comprising of 25 Kms
RCC roads and 38 Kms Bituminous roads as per IRC specifications
including necessary culverts, drains, sleeves for cable
crossings, abutments, transition walls and wing walls,
etc. |
| |
|
| |
Industrial
Estate - Gauriganj, Dist. Sultanpur (U.P.) AND Hindustan
Aeronautics Ltd., - Korwa, Dist. Sultanpur (U.P.) |
| |
Approximate
65000 Sqm. 25 mm th bituminous cone road with seal coat
over two layer of 75 mm th. WBM of Township, as per IRC
specification. |
| |
|
| |
U.P.
Petro Chemicals (GAIL Project) - PATA, Dist. Etawah (U.P.)
|
| |
Massive
Area Grading comprising of approx. seven million cum of
earth work in cutting & filling apart from laying
30 Kms of WBM Roads as per IRC specifications engaging
most modern technique and machinery. |
| |
|
| |
Indo
Gulf Fertilizer and Chemical Corporation - Jagdishpur,
Dist. Sultanpur (U.P.) |
| |
The
scope involved laying of approximately 20 Kms. of heavy
duty Industrial road as per IRC specification with RCC
drains, culverts & cable crossings. |
| |
|
| |
World
Bank Aided Project - Sonauli - Gorakhpur Road |
| |
Improvement
& Rehabilitation of 80 km long heavy duty metal road
as per MOST (Ministry of Surface Transport) specifications.
The job involves widening & straightening of existing
stretch. |
| |
|
| |
Industrial
Projects |
| |
Indoor substation, In plant piping, pump house, control
room building and associated civil works – Reliance
Petro Chemicals, Jam Nagar |
| |
Construction
of Sub-Station Buildings, PIB Buildings, Petro Chemical
complex Piping, Equipment Erection & Structural Steel
Works in MEROX unit, Tankage Piping & Equipments Erection
including Hydrogen Package in AROMATICS plant. Sleeper
Piping for Fire Water Pipe Line in FLARE STACK Area including
Equipment Erection and U/G & A/G Piping for Intake
Pump House & Reservoir in MARINE TANK FARM. |
| |
|
| |
Combined
cycle power plant for Andhra Pradesh Gas Power Corporation
– Vijjeshwaram, Dist. West Godavari, AP |
| |
Complete
civil & structural works connected with 170 MW CC
power plant including all foundations & buildings
viz. Transformer Foundation, Turbine Foundation, Foundation
for Bypass Stack & Main stack, Guillotine & Diverter
Damper Local & Main Control Room, Workshop Building,
Gas Booster Building, Circulation Water Pump house, Circulation
Water Pipeline, Waste Water Pipeline, Seal pit, Water
Treatment including DM Plant . |
| |
|
| |
Combined
Cycle Power Plant for M/s. North East Electric Power Corporation,
Shillong - Kathalguri, Assam |
| |
All
civil & structural work for 9 x 33 MW power plant
including all foundations & buildings viz. Transformer
Foundation, Turbine Foundation, Foundation for Bypass
Stack & Main stack, Guillotine & Diverter Damper
Local & Main Control Room, Workshop Building, Gas
Booster Building, Circulation Water Pump house, Circulation
Water Pipeline, Waste Water Pipeline, Seal pit, Water
Treatment including DM Plant |
| |
|
| |
Ordinance
Factory - Itarsi (M.P.) |
| |
Process
and non-process buildings covering blast proof structures
requiring earthen dykes, nodes and RCC walls, provided
with automatic doors & fire proof doors operative
in case of emergency apart from necessary machine foundations
for vibratory & static equipments. All constructions,
strictly adhering to CCOE regulations. |
| |
|
| |
Thermal
Power Project - TANDA Dist., FAIZABAD (U.P.) |
| |
Civil
& structural works for 4 x 110 MW Thermal Power Plant
including all foundations & buildings viz. Transformer
Foundation, Turbine Foundation, Foundation for Bypass
Stack & Main stack, Guillotine & Diverter Damper
Local & Main Control Room, Workshop Building, Gas
Booster Building, Circulation Water Pump house, Circulation
Water Pipeline, Waste Water Pipeline, Seal pit, Water
Treatment including DM Plant of Boiler foundations with
ancillary structures. |
| |
|
| |
Parichha
Thermal Power Project - Parichha, Dist. Jhansi (U.P.) |
| |
Intake
Pump House, Intake RCC Duct and Intake open Channel with
RCC lining for the 4 x 110 MW Thermal Power Plant. |
| |
|
| |
Indo
Gulf Fertilizer and Chemical Corporation - Jagdishpur,
Dist. Sultanpur (U.P.) |
| |
Non
process buildings covering Administrative Building, Cement
Godown, Warehouse & Workshop Building for 2200 TPD
UREA & 1400 TPD AMMONIA production. |
| |
|
| |
Residential
Projects |
| |
Township
for Thermal Power Project - Sarni Dist. Betul (M.P.) |
| |
300
units of Two Bedroom flats & 200 units of Three Bedroom
flats with necessary finishes, External, & Internal
Water Supply, Sanitation and Internal Electrification. |
| |
|
| |
Hindustan
Aeronautics Ltd. - Korwa, Dist. Sultanpur (U.P.) |
| |
900
units of single bedroom housing units including all finishes,
External & Internal Water Supply & Sanitation
and Internal Electrification. |
| |
|
| 7. |
PERSONAL INFORMATION
|
| Marital
status |
: |
Married |
| Nationality |
: |
Indian |
| Date
of Birth |
: |
5th
January, 1955 |
| Passport
No |
: |
E
3508131 |
| Valid
Up to |
: |
28/10/2012 |
| Proficiency
|
: |
Good
in English and Hindi |
|
| Click
here to email Mr. K. Nandan |
The
following CV was posted on December 27, 2004
PINAKI
MUKHERJEE
CONTACT
ADDRESS:
C/o Shri Bibhutosh Mukherjee
8 No., S.V Road
Kolkata-700074
State: West Bengal
Country: India
Phone (Res): - 0091-33-25792241
Office: - 00975-8-477200
E-mail: pinakim30@rediffmail.com
Pass port No- A-7950285
Date of issue- 13/05/2004
Date of expiry- 12/05/2004
CAREER OBJECTIVE
To
grow as an effective Professional and drive the company in
a manner which will help the company to move towards the higher
targets as well as to help myself to strengthen my job competency
and grow within the Company.
PERSONAL INFORMATION
Date
of Birth - October 30th 1973
Nationality - Indian
Marital Status - Unmarried
Languages - English, Hindi & Bengali
ACADEMIC
AND PROFESSIONALS QUALIFICATIONS
1.
Passed Diploma of Engineering (Civil) from West Bengal State
Council of Engineering & Technical Education with 70%
marks in 1996
2.
Passed Higher Secondary (10+2) with 55% marks in 1991 (West
Bengal Board of Higher Secondary Education)
3.
Passed Matriculation with 60% marks in 1989 (West Bengal Board
of Secondary Education)
COMPUTER SKILLS:
Software Tools : AUTOCAD & M.S OFFICE
Operating System : WINDOWS
EXTRA
CURRICULAR ACTIVITIES:
Member
of Kaizen Co-ordination committee at Tala C-1 Project, Bhutan.
Document Controller of ISO procedures at Tala C-1 Project,
Bhutan.
PROFESSIONAL
EXPERIENCE: (Quantity Surveying)
M/S
HINDUSTAN CONSTRUCTION COMPANY LIMITED
1. Construction of Dhauliganga Hydroelectric Project –
Surge Shaft, Pressure Shaft, Power House
2. Tala Hydroelectric Project, Bhutan -Construction of Civil
Works for Concrete Gravity Dam Of 92m height, Intake, Desilting
arrangement & Head Race Tunnel from Thiyomachu
Position:
Quantity Survey Engineer- Mar. 2001 till date
Responsibilities
1. Rate analysis of Extra and Deviated Items and Hourly Use
Rate of Equipments.
2. Detailed Study of B.O.Q, Technical Specifications and incorporating
the various factors coming out of Contracts.
3. Reconciliation of materials.
4. Work done reconciliation & other documents for MIS.
5. Sub contractor bill preparation and checking M.B of Sub-Contractors.
6. Sub contractor correspondence & sub-contractor reconciliation.
7. Preparation of work orders for Sub-Contractors.
8. Regular Contractual Correspondence with Clients.
9. Quantification of Acceleration measures taken and submitted
to Client for extra billing.
10. Maintaining a proper record of Salient features of the
Contract, Important Submittals, Observation on important Clauses,
Entitlement E.O.T/Cost Clauses,
11. Maintaining Joint measurement with client and preparations
of monthly bills.
12. Other correspondence with client.
13. Preparing documents for internal & external audits.
M/S JAI PRAKASH INDUSTRIES LTD.
Tala
Hydroelectric Project, Bhutan
Position: Junior Engineer - August 99 to Feb. 2001
Responsibilities:
1. Construction of Surge Shaft Top, Pressure Shaft.
2. To prepare reconciliation statement of Steel, Cement and
Aggregates.
3. PRW’s and Subcontractor bill preparation and verifying
their bills for the work done.
4. Regular Contractual Correspondences with Clients.
M/S
N. BHADURY AND CO. (Class-I Contractor of C.P.W.D)
Position: Ste engineer- July 96 to July 1999
Responsibilities: - Project Leader for execution of the following:
1. Execution of 10 storied Office bldg., 4 storied (10Nos)
& 2 storied Duplex Type Residential building
2. Storm water line and sewerage water line
3. C.I Water supply line (Grid System)
4. Road work (W.B.M)
5. Preparation of clients bills, estimate, rate analysis and
taking measurements
6. Sub-contractors bills
7. Making details for Arbitration
CORE
COMPETENCY:
1) Site supervision
2) Quantity Surveying.
3) Contractual Correspondence.
4) Liaison with Client
PRESENT SALARY:
Rs.
2,00,000/= per annum
EXPECTED SALARY:
Negotiable.
Click
here to email Pinaki Mukherjee
The
following CV was posted on January 5, 2005
TAUHEED KHAN
Date of Birth : 01 – 08– 1969
Passport No. : E 7780554 valid upto 15.02.2014
Present Address :
NL-5 /3, Flat No.-11,Near Shivaji Chowk,
Sector -3 , Nerul , Navi Mumbai,
Cell No.-9820798314
E mail : tkhan_aec@yahoo.co.in
Permanent
Address :
S/o Mr Shareef Khan,
Tulsi Nagar , Kasia , Ward No.7, Kasia
Kushinagar- Dist.,Uttar Pradesh, India
Pin -274402, Tel: 05564-272533
Language Known : English, Urdu & Hindi
Martial
Status : Married and having a school going baby
Qualification
: I. B E Civil - I class in 1991 from Karnataka University
Computer skill: MS Project -2000 & M
S office-2000
Training : (I) For Construction Safety Conducted
By National Safety Council of India, (II) For Construction
Safety Conducted By Supreme Petrochem Ltd, Nagothane
Career
Summary : Around 13 Years vast experience in Execution,
Planning & Monitoring,
Co-ordination, Quality Control / Estimation & Billing
for Civil & Structural work in various Industrial Projects
i.e. Finolex Pipes Ltd., Supreme Petrochem Ltd, H & R
Johnson (I) Ltd, TISC SEB, V V F Ltd.
Worked under various consultants i.e. M/s Uhde India Ltd,
M/S M.N Dastoor (P) Ltd ,M/s Bhagawati Designs Pvt Ltd., M/s
International Airport Authority of India
Employment/Site Details: I am associated with M/s
Ray Constructions, IIT Post, Powai, Mumbai-76,
since May 1992, at present working at it’s V V F Ltd,
Project site. Earlier to M/s Ray
Constructions I worked with M/s M J Constructions during Aug’91
to March’92.
Brief Experience details are as follows
I .Since Feb’03 to till date
At Fatty Alcohol Plant for M/s VVF Ltd, MIDC Taloja, Navi
Mumbai,
Post Held : Project Engineer
Job Responsibility : Over all responsible for Planning, scheduling,
monitoring and billing, rate analysis ,reconciliation of materials
for the whole project of Civil & Structural work of Process
Building, Main Sub Station Building, Raw/Fire Water Tank,
Tank Farm area, Admin/Utility Building and Associated units
of Saponification Plant i.e CSL-DCA Finishing line,TPCP/MCC
Bldg, Tank farm area
II.
July’02 to Jan’03
At Haul Road SEB Project for M/s TISCO (W B Division), Ghatotand,
Jharkhand
Job Responsibility : Over all responsible for Planning, scheduling,
monitoring , execution and billing for Embankment & Sub
grade preparation, 200 mm thick Layer Granular Sub Base, Water
Bound Macadam in two Layer , Wet mix macadam ,Bitumen Macadam
in two layer 75 mm thick , Open Graded Premix Carpet, Seal
Coat [all as per specification of MOST]
III.
May’98 to June’02 :
At Supreme Petrochem Ltd, Nagothane,Raigad-Dist. II Phase
:
Job Responsibility: Over all responsible for Planning, scheduling,
monitoring , execution and billing , Co-ordination with Client
& consultant, Preparation of Bills, Quality Control, Reconciliation
of materials for Civil & Structural work for the following
1. New Ware House
2. HIPS –III Line Process Unit and associated Utilities
3. Specialty Polystyrene Plant, its Utilities and office Building
4. Club House: Cafeteria, Gymnasium, swimming Pool, Badminton
Court,
5. Flyover, WBM Roads, Carpeting of Roads, Site Grading work
etc
IV.
Sept’97 to April’98
[A] At Supreme Petrochem Ltd :
Job Responsibility: Over all in charge for Supervision, Estimation
& Billing, Quality Control for civil works of
Compressor house extension & Other Miscellaneous civil
works
[B]
At M/S Johnson India Ltd, Pen Raigad-Dist.
Job Responsibility: Supervision, Estimation & Billing,
Quality Control for Murrum Filling in Marine Clay /Slush [2
lacs cum], compound wall supported over under ream piles.
V. Sept’94 to Aug’97 ;
At Supreme Petrochem Ltd, Nagothane,Raigad –Dist. I
Phase:
Job Responsibility: Supervision, Preparation bills, Quality
Control/Reconciliation of materials, for Civil & Structural
work for various jobs ,i.e Site Grading, WBM Roads and carpeting
, HIPS –I Line Utilities i.e. 220 KVA Switchyard, Main
Sub Station, Raw Water Tank, Cooling Tower, Pipe Racks etc,
Effluent Treatment Plant, Administration bldg, Main gate bldg
.
VI. Sept’92 to Aug’94
At Finolex Pipes Ltd, Pawas, Ratnagiri –Dist :
Job Responsibility: Supervision of utilities i.e. Supervision
of Main Sub Stations, LPG Tank, Fire Station Site Grading,
WBM Roads, Preparation of bills for WBM roads only,
Reconciliation of materials for Civil & Structural Work
for Utilities of I Phase plant
VII.
May’92 to Aug’92
At International Airport ,Sahar Mumbai –
Job Responsibility: Supervision of above job, Scrutiny &
Certification of Sub-contractor bills for Renovation of B3
taxi Track i.e.Removal of existing Pavement, Laying PCC, BM,
AC, DAC work,
VIII.
Aug ’91 to March’92 ; Worked With M/s M J Constructions
;
Job Responsibility : Supervision & Preparation of Bar
Bending Schedule for Civil works of Punit Tower, Belapur ,Navi
Mumbai
Tauheed Khan
Click
here to email Mr. Tauheed
Khan
|
|